A technician is using a dead-zone box (launch ring) of 1000m to test a 500m fiber link. Why is the launch cable longer than the link being tested?

Answers
AThe launch cable length is irrelevant to the link length; it only needs to be long enough to overcome the OTDR launch dead zone and allow measurement of the first connector
BThis is a mistake; the launch cable must be shorter than the link
CIt ensures the OTDR pulse reflects back exactly in phase
DThe launch cable acts as an amplifier for short links
The answer and explanation are in the full bank.